{"items":[{"id":2169,"countryCode":"CN","unitName":"BAILONG-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"CAP1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":39,"siteName":"FANGCHENGGANG","thermalPower":3400,"grossElectricalCapacity":1254,"netElectricalCapacity":1160,"designNetElectricalCapacity":1160,"constructionDate":"2025-12-22T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2024-09-27T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"China Power Investment Guangxi Nuclear Power Co., Ltd.","ownerName":"China Power Investment Guangxi Nuclear Power Co., Ltd.","turbineSupplierCode":"HE","turbineSupplierName":"Harbin Electric Co., Ltd.","reactorSupplierCode":"SENPE","reactorSupplierName":"Shanghai Electric Nuclear Power Equipment Co., Ltd","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":939,"countryCode":"CN","unitName":"CHANGJIANG-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CNP-600","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":38,"siteName":"CHANG JIANG","thermalPower":1930,"grossElectricalCapacity":650,"netElectricalCapacity":601,"designNetElectricalCapacity":601,"constructionDate":"2010-04-25T00:00:00","criticalityDate":"2015-10-12T00:00:00","gridDate":"2015-11-07T00:00:00","commercialDate":"2015-12-25T00:00:00","shutdownDate":null,"constructionLicenseDate":"2010-04-20T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-01-24T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Hainan Nuclear Power Company","ownerName":"Hainan Nuclear Power Company","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":96784,"ageNet":96768.00,"lifetimeFactor":null},{"id":940,"countryCode":"CN","unitName":"CHANGJIANG-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CNP-600","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":38,"siteName":"CHANG JIANG","thermalPower":1930,"grossElectricalCapacity":650,"netElectricalCapacity":601,"designNetElectricalCapacity":601,"constructionDate":"2010-11-21T00:00:00","criticalityDate":"2016-06-09T00:00:00","gridDate":"2016-06-20T00:00:00","commercialDate":"2016-08-12T00:00:00","shutdownDate":null,"constructionLicenseDate":"2010-04-07T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-01-24T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Hainan Nuclear Power Company","ownerName":"CHINA NATIONAL NUCLEAR CORPORATION","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":91360,"ageNet":91344.00,"lifetimeFactor":null},{"id":941,"countryCode":"CN","unitName":"CHANGJIANG-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":38,"siteName":"CHANG JIANG","thermalPower":3190,"grossElectricalCapacity":1198,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2021-03-31T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2021-03-30T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"China Huaneng Group","ownerName":"China Huaneng Group","turbineSupplierCode":"HEC","turbineSupplierName":"HARBIN ELECTRIC CORPORATION","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":942,"countryCode":"CN","unitName":"CHANGJIANG-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":38,"siteName":"CHANG JIANG","thermalPower":3190,"grossElectricalCapacity":1198,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2021-12-28T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2021-03-31T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"China Huaneng Group","ownerName":"China Huaneng Group","turbineSupplierCode":"HEC","turbineSupplierName":"HARBIN ELECTRIC CORPORATION","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":554,"countryCode":"CN","unitName":"CHINSHAN-1 (Taiwan, China)","typeName":"Boiling Light-Water-Cooled and Moderated Reactor","statusName":"Permanent Shutdown","countryName":"China","model":"BWR-4 (Mark 1)","alternateName":null,"typeCode":"BWR","statusCode":"4S","siteId":296,"siteName":"CHINSHAN","thermalPower":1840,"grossElectricalCapacity":636,"netElectricalCapacity":604,"designNetElectricalCapacity":604,"constructionDate":"1972-06-02T00:00:00","criticalityDate":"1977-10-16T00:00:00","gridDate":"1977-11-16T00:00:00","commercialDate":"1978-12-10T00:00:00","shutdownDate":"2018-12-06T00:00:00","constructionLicenseDate":"1972-02-01T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"1977-09-24T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Taiwan Power Co.","ownerName":"Taiwan Power Co.","turbineSupplierCode":"WH","turbineSupplierName":"WESTINGHOUSE ELECTRIC CORPORATION","reactorSupplierCode":"GE","reactorSupplierName":"GENERAL ELECTRIC CO.","defaultImageId":2030,"defaultImageName":"2030.jpg","informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":429664,"ageNet":359880.00,"lifetimeFactor":null},{"id":555,"countryCode":"CN","unitName":"CHINSHAN-2 (Taiwan, China)","typeName":"Boiling Light-Water-Cooled and Moderated Reactor","statusName":"Permanent Shutdown","countryName":"China","model":"BWR-4 (Mark 1)","alternateName":null,"typeCode":"BWR","statusCode":"4S","siteId":296,"siteName":"CHINSHAN","thermalPower":1840,"grossElectricalCapacity":636,"netElectricalCapacity":604,"designNetElectricalCapacity":604,"constructionDate":"1973-12-07T00:00:00","criticalityDate":"1978-11-09T00:00:00","gridDate":"1978-12-19T00:00:00","commercialDate":"1979-07-15T00:00:00","shutdownDate":"2019-07-16T00:00:00","constructionLicenseDate":"1973-08-13T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"1978-11-01T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Taiwan Power Co.","ownerName":"Taiwan Power Co.","turbineSupplierCode":"WH","turbineSupplierName":"WESTINGHOUSE ELECTRIC CORPORATION","reactorSupplierCode":"GE","reactorSupplierName":"GENERAL ELECTRIC CO.","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":420112,"ageNet":355656.00,"lifetimeFactor":null},{"id":63,"countryCode":"CN","unitName":"DAYA BAY-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"M310","alternateName":"Guangdong 1","typeCode":"PWR","statusCode":"1O","siteId":41,"siteName":"GUANGDONG","thermalPower":2905,"grossElectricalCapacity":1026,"netElectricalCapacity":986,"designNetElectricalCapacity":930,"constructionDate":"1987-08-07T00:00:00","criticalityDate":"1993-07-28T00:00:00","gridDate":"1993-08-31T00:00:00","commercialDate":"1994-02-01T00:00:00","shutdownDate":null,"constructionLicenseDate":null,"decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"1994-11-28T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Daya Bay Nuclear Power Operations and Management Co, Ltd.","ownerName":"GUANGDONG NUCLEAR POWER JOINT VENTURE COMPANY LIMITED","turbineSupplierCode":"GEC","turbineSupplierName":"GENERAL ELECTRIC COMPANY (UK)","reactorSupplierCode":"FRAM","reactorSupplierName":"FRAMATOME","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":291256,"ageNet":291240.00,"lifetimeFactor":null},{"id":64,"countryCode":"CN","unitName":"DAYA BAY-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"M310","alternateName":"Guangdong 2","typeCode":"PWR","statusCode":"1O","siteId":41,"siteName":"GUANGDONG","thermalPower":2905,"grossElectricalCapacity":1026,"netElectricalCapacity":986,"designNetElectricalCapacity":930,"constructionDate":"1988-04-07T00:00:00","criticalityDate":"1994-01-21T00:00:00","gridDate":"1994-02-07T00:00:00","commercialDate":"1994-05-06T00:00:00","shutdownDate":null,"constructionLicenseDate":"1988-01-06T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"1995-03-24T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Daya Bay Nuclear Power Operations and Management Co, Ltd.","ownerName":"GUANGDONG NUCLEAR POWER JOINT VENTURE COMPANY LIMITED","turbineSupplierCode":"GEC","turbineSupplierName":"GENERAL ELECTRIC COMPANY (UK)","reactorSupplierCode":"FRAM","reactorSupplierName":"FRAMATOME","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":287416,"ageNet":287400.00,"lifetimeFactor":null},{"id":943,"countryCode":"CN","unitName":"FANGCHENGGANG-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":39,"siteName":"FANGCHENGGANG","thermalPower":2905,"grossElectricalCapacity":1086,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2010-07-30T00:00:00","criticalityDate":"2015-10-13T00:00:00","gridDate":"2015-10-25T00:00:00","commercialDate":"2016-01-01T00:00:00","shutdownDate":null,"constructionLicenseDate":"2010-07-18T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2017-10-30T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Guangxi Fangchenggang Nuclear Power Company, Ltd.","ownerName":"Guangxi Fangchenggang Nuclear Power Company, Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":2046,"defaultImageName":"2046.jpg","informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":97096,"ageNet":97080.00,"lifetimeFactor":null},{"id":944,"countryCode":"CN","unitName":"FANGCHENGGANG-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":39,"siteName":"FANGCHENGGANG","thermalPower":2905,"grossElectricalCapacity":1086,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2010-12-23T00:00:00","criticalityDate":"2016-06-29T00:00:00","gridDate":"2016-07-15T00:00:00","commercialDate":"2016-10-01T00:00:00","shutdownDate":null,"constructionLicenseDate":"2010-07-18T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2017-10-30T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Guangxi Fangchenggang Nuclear Power Company, Ltd.","ownerName":"Guangxi Fangchenggang Nuclear Power Company, Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":90760,"ageNet":90744.00,"lifetimeFactor":null},{"id":945,"countryCode":"CN","unitName":"FANGCHENGGANG-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":39,"siteName":"FANGCHENGGANG","thermalPower":3150,"grossElectricalCapacity":1180,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2015-12-24T00:00:00","criticalityDate":"2022-12-27T00:00:00","gridDate":"2023-01-10T00:00:00","commercialDate":"2023-03-25T00:00:00","shutdownDate":null,"constructionLicenseDate":"2015-12-16T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2020-08-26T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Guangxi Fangchenggang Nuclear Power Company, Ltd.","ownerName":"Guangxi Fangchenggang Nuclear Power Company, Ltd.","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":33880,"ageNet":33864.00,"lifetimeFactor":null},{"id":946,"countryCode":"CN","unitName":"FANGCHENGGANG-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":39,"siteName":"FANGCHENGGANG","thermalPower":3150,"grossElectricalCapacity":1180,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2016-12-23T00:00:00","criticalityDate":"2024-04-03T00:00:00","gridDate":"2024-04-09T00:00:00","commercialDate":"2024-05-25T00:00:00","shutdownDate":null,"constructionLicenseDate":"2015-12-16T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2023-03-01T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Guangxi Fangchenggang Nuclear Power Company, Ltd.","ownerName":"Guangxi Fangchenggang Nuclear Power Company, Ltd.","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":22960,"ageNet":22944.00,"lifetimeFactor":null},{"id":912,"countryCode":"CN","unitName":"FANGJIASHAN-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":51,"siteName":"QINSHAN","thermalPower":2905,"grossElectricalCapacity":1089,"netElectricalCapacity":1012,"designNetElectricalCapacity":1000,"constructionDate":"2008-12-26T00:00:00","criticalityDate":"2014-10-21T00:00:00","gridDate":"2014-11-04T00:00:00","commercialDate":"2014-12-15T00:00:00","shutdownDate":null,"constructionLicenseDate":"2008-12-25T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2017-04-28T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Nuclear Operation Management Company Limited","ownerName":"QINSHAN NUCLEAR POWER COMPANY","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"NPIC","reactorSupplierName":"Nuclear Power Institute of China","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":105616,"ageNet":105600.00,"lifetimeFactor":null},{"id":913,"countryCode":"CN","unitName":"FANGJIASHAN-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":51,"siteName":"QINSHAN","thermalPower":2905,"grossElectricalCapacity":1089,"netElectricalCapacity":1012,"designNetElectricalCapacity":1000,"constructionDate":"2009-07-17T00:00:00","criticalityDate":"2014-12-25T00:00:00","gridDate":"2015-01-12T00:00:00","commercialDate":"2015-02-12T00:00:00","shutdownDate":null,"constructionLicenseDate":"2008-12-25T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2017-04-28T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Nuclear Operation Management Company Limited","ownerName":"QINSHAN NUCLEAR POWER COMPANY","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"NPIC","reactorSupplierName":"Nuclear Power Institute of China","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":103960,"ageNet":103944.00,"lifetimeFactor":null},{"id":914,"countryCode":"CN","unitName":"FUQING-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CNP-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":40,"siteName":"FUQING","thermalPower":2905,"grossElectricalCapacity":1089,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2008-11-21T00:00:00","criticalityDate":"2014-07-24T00:00:00","gridDate":"2014-08-20T00:00:00","commercialDate":"2014-11-22T00:00:00","shutdownDate":null,"constructionLicenseDate":"2008-11-12T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2017-04-20T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Fujian Fuqing Nuclear Power Co., LTD","ownerName":"CNNC Fujian Fuqing Nuclear Power Co., LTD","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"NPIC","reactorSupplierName":"Nuclear Power Institute of China","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":107440,"ageNet":107424.00,"lifetimeFactor":null},{"id":915,"countryCode":"CN","unitName":"FUQING-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CNP-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":40,"siteName":"FUQING","thermalPower":2905,"grossElectricalCapacity":1089,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2009-06-17T00:00:00","criticalityDate":"2015-07-22T00:00:00","gridDate":"2015-08-06T00:00:00","commercialDate":"2015-10-16T00:00:00","shutdownDate":null,"constructionLicenseDate":"2008-11-12T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2017-04-20T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Fujian Fuqing Nuclear Power Co., LTD","ownerName":"CNNC Fujian Fuqing Nuclear Power Co., LTD","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"NPIC","reactorSupplierName":"Nuclear Power Institute of China","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":99016,"ageNet":99000.00,"lifetimeFactor":null},{"id":935,"countryCode":"CN","unitName":"FUQING-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CNP-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":40,"siteName":"FUQING","thermalPower":2905,"grossElectricalCapacity":1089,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2010-12-31T00:00:00","criticalityDate":"2016-07-03T00:00:00","gridDate":"2016-09-07T00:00:00","commercialDate":"2016-10-24T00:00:00","shutdownDate":null,"constructionLicenseDate":"2010-12-30T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-08-07T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Fujian Fuqing Nuclear Power Co., LTD","ownerName":"CNNC Fujian Fuqing Nuclear Power Co., LTD","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"NPIC","reactorSupplierName":"Nuclear Power Institute of China","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":89464,"ageNet":89448.00,"lifetimeFactor":null},{"id":936,"countryCode":"CN","unitName":"FUQING-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CNP-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":40,"siteName":"FUQING","thermalPower":2905,"grossElectricalCapacity":1089,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2012-11-17T00:00:00","criticalityDate":"2017-07-16T00:00:00","gridDate":"2017-07-29T00:00:00","commercialDate":"2017-09-17T00:00:00","shutdownDate":null,"constructionLicenseDate":"2010-12-30T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-08-07T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Fujian Fuqing Nuclear Power Co., LTD","ownerName":"CNNC Fujian Fuqing Nuclear Power Co., LTD","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"NPIC","reactorSupplierName":"Nuclear Power Institute of China","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":81664,"ageNet":81648.00,"lifetimeFactor":null},{"id":937,"countryCode":"CN","unitName":"FUQING-5","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":40,"siteName":"FUQING","thermalPower":3050,"grossElectricalCapacity":1161,"netElectricalCapacity":1075,"designNetElectricalCapacity":1075,"constructionDate":"2015-05-07T00:00:00","criticalityDate":"2020-10-21T00:00:00","gridDate":"2020-11-27T00:00:00","commercialDate":"2021-01-30T00:00:00","shutdownDate":null,"constructionLicenseDate":"2015-05-06T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2020-04-21T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Fujian Fuqing Nuclear Power Co., LTD","ownerName":"CNNC Fujian Fuqing Nuclear Power Co., LTD","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"NPIC","reactorSupplierName":"Nuclear Power Institute of China","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":52456,"ageNet":52440.00,"lifetimeFactor":null},{"id":938,"countryCode":"CN","unitName":"FUQING-6","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":40,"siteName":"FUQING","thermalPower":3060,"grossElectricalCapacity":1150,"netElectricalCapacity":1075,"designNetElectricalCapacity":1075,"constructionDate":"2015-12-22T00:00:00","criticalityDate":"2021-12-11T00:00:00","gridDate":"2022-01-01T00:00:00","commercialDate":"2022-03-25T00:00:00","shutdownDate":null,"constructionLicenseDate":"2015-05-06T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2020-04-21T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Fujian Fuqing Nuclear Power Co., LTD","ownerName":"CNNC Fujian Fuqing Nuclear Power Co., LTD","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"NPIC","reactorSupplierName":"Nuclear Power Institute of China","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":42856,"ageNet":42840.00,"lifetimeFactor":null},{"id":908,"countryCode":"CN","unitName":"HAIYANG-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"AP-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":42,"siteName":"HAIYANG","thermalPower":3415,"grossElectricalCapacity":1250,"netElectricalCapacity":1170,"designNetElectricalCapacity":1126,"constructionDate":"2009-09-24T00:00:00","criticalityDate":"2018-08-08T00:00:00","gridDate":"2018-08-17T00:00:00","commercialDate":"2018-10-22T00:00:00","shutdownDate":null,"constructionLicenseDate":"2009-09-04T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2019-01-07T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Shandong Nuclear Power Company, Ltd.","ownerName":"China Power Investment Group","turbineSupplierCode":"MHI","turbineSupplierName":"MITSUBISHI HEAVY INDUSTRIES, LTD.","reactorSupplierCode":"WH","reactorSupplierName":"WESTINGHOUSE ELECTRIC CORPORATION","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":72448,"ageNet":72432.00,"lifetimeFactor":null},{"id":909,"countryCode":"CN","unitName":"HAIYANG-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"AP-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":42,"siteName":"HAIYANG","thermalPower":3415,"grossElectricalCapacity":1250,"netElectricalCapacity":1170,"designNetElectricalCapacity":1126,"constructionDate":"2010-06-20T00:00:00","criticalityDate":"2018-09-29T00:00:00","gridDate":"2018-10-13T00:00:00","commercialDate":"2019-01-09T00:00:00","shutdownDate":null,"constructionLicenseDate":"2009-09-24T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2019-01-07T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Shandong Nuclear Power Company, Ltd.","ownerName":"China Power Investment Group","turbineSupplierCode":"MHI","turbineSupplierName":"MITSUBISHI HEAVY INDUSTRIES, LTD.","reactorSupplierCode":"WH","reactorSupplierName":"WESTINGHOUSE ELECTRIC CORPORATION","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":71080,"ageNet":71064.00,"lifetimeFactor":null},{"id":993,"countryCode":"CN","unitName":"HAIYANG-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"CAP1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":42,"siteName":"HAIYANG","thermalPower":3400,"grossElectricalCapacity":1253,"netElectricalCapacity":1161,"designNetElectricalCapacity":1161,"constructionDate":"2022-07-07T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2013-04-25T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Shandong Nuclear Power Company, Ltd.","ownerName":"China Power Investment Group","turbineSupplierCode":"HTC","turbineSupplierName":"HARBIN TURBINE COMPANY LIMITED","reactorSupplierCode":"SNERDI","reactorSupplierName":"Shanghai Nuclear Engineering Research and Design Institute Co. LTD","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":994,"countryCode":"CN","unitName":"HAIYANG-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"CAP1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":42,"siteName":"HAIYANG","thermalPower":3400,"grossElectricalCapacity":1253,"netElectricalCapacity":1161,"designNetElectricalCapacity":1161,"constructionDate":"2023-04-22T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2013-04-25T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Shandong Nuclear Power Company, Ltd.","ownerName":"China Power Investment Group","turbineSupplierCode":"HTC","turbineSupplierName":"HARBIN TURBINE COMPANY LIMITED","reactorSupplierCode":"SNERDI","reactorSupplierName":"Shanghai Nuclear Engineering Research and Design Institute Co. LTD","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":904,"countryCode":"CN","unitName":"HONGYANHE-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":44,"siteName":"HONGYANHE","thermalPower":2905,"grossElectricalCapacity":1119,"netElectricalCapacity":1061,"designNetElectricalCapacity":1061,"constructionDate":"2007-08-18T00:00:00","criticalityDate":"2013-01-16T00:00:00","gridDate":"2013-02-17T00:00:00","commercialDate":"2013-06-06T00:00:00","shutdownDate":null,"constructionLicenseDate":"2007-08-15T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2016-12-30T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)","ownerName":"Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":120616,"ageNet":120600.00,"lifetimeFactor":null},{"id":905,"countryCode":"CN","unitName":"HONGYANHE-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":44,"siteName":"HONGYANHE","thermalPower":2905,"grossElectricalCapacity":1119,"netElectricalCapacity":1061,"designNetElectricalCapacity":1061,"constructionDate":"2008-03-28T00:00:00","criticalityDate":"2013-10-24T00:00:00","gridDate":"2013-11-23T00:00:00","commercialDate":"2014-05-13T00:00:00","shutdownDate":null,"constructionLicenseDate":"2007-08-15T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2016-12-30T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)","ownerName":"Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":113920,"ageNet":113904.00,"lifetimeFactor":null},{"id":906,"countryCode":"CN","unitName":"HONGYANHE-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":44,"siteName":"HONGYANHE","thermalPower":2905,"grossElectricalCapacity":1119,"netElectricalCapacity":1061,"designNetElectricalCapacity":1061,"constructionDate":"2009-03-07T00:00:00","criticalityDate":"2014-10-27T00:00:00","gridDate":"2015-03-23T00:00:00","commercialDate":"2015-08-16T00:00:00","shutdownDate":null,"constructionLicenseDate":"2009-01-10T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-06-08T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)","ownerName":"Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":102280,"ageNet":102264.00,"lifetimeFactor":null},{"id":907,"countryCode":"CN","unitName":"HONGYANHE-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":44,"siteName":"HONGYANHE","thermalPower":2905,"grossElectricalCapacity":1119,"netElectricalCapacity":1061,"designNetElectricalCapacity":1061,"constructionDate":"2009-08-15T00:00:00","criticalityDate":"2016-03-05T00:00:00","gridDate":"2016-04-01T00:00:00","commercialDate":"2016-06-08T00:00:00","shutdownDate":null,"constructionLicenseDate":"2009-01-10T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-06-08T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)","ownerName":"Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":93280,"ageNet":93264.00,"lifetimeFactor":null},{"id":997,"countryCode":"CN","unitName":"HONGYANHE-5","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"ACPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":44,"siteName":"HONGYANHE","thermalPower":2905,"grossElectricalCapacity":1119,"netElectricalCapacity":1061,"designNetElectricalCapacity":1061,"constructionDate":"2015-03-29T00:00:00","criticalityDate":"2021-06-13T00:00:00","gridDate":"2021-06-25T00:00:00","commercialDate":"2021-07-31T00:00:00","shutdownDate":null,"constructionLicenseDate":"2015-03-13T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2019-12-30T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)","ownerName":"Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":47416,"ageNet":47400.00,"lifetimeFactor":null},{"id":998,"countryCode":"CN","unitName":"HONGYANHE-6","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"ACPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":44,"siteName":"HONGYANHE","thermalPower":2905,"grossElectricalCapacity":1119,"netElectricalCapacity":1061,"designNetElectricalCapacity":1061,"constructionDate":"2015-07-24T00:00:00","criticalityDate":"2022-04-21T00:00:00","gridDate":"2022-05-02T00:00:00","commercialDate":"2022-06-23T00:00:00","shutdownDate":null,"constructionLicenseDate":"2015-03-10T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2020-07-30T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)","ownerName":"Liaoning Hongyanhe Nuclear Power Co. Ltd. (LHNPC)","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":39952,"ageNet":39936.00,"lifetimeFactor":null},{"id":2167,"countryCode":"CN","unitName":"JINQIMEN-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":1583,"siteName":"NINGBO","thermalPower":3190,"grossElectricalCapacity":1233,"netElectricalCapacity":1145,"designNetElectricalCapacity":1145,"constructionDate":"2025-08-10T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2024-06-14T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CHINA NATIONAL NUCLEAR CORPORATION","ownerName":"CHINA NATIONAL NUCLEAR CORPORATION","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"NPIC","reactorSupplierName":"Nuclear Power Institute of China","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":2208,"countryCode":"CN","unitName":"JINQIMEN-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":1604,"siteName":"jinqimen","thermalPower":3190,"grossElectricalCapacity":1230,"netElectricalCapacity":1145,"designNetElectricalCapacity":1145,"constructionDate":"2026-04-04T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2024-06-14T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC (Xiangshan) Nuclear Energy Co., Ltd.","ownerName":"CNNC (Xiangshan) Nuclear Energy Co., Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"NPIC","reactorSupplierName":"Nuclear Power Institute of China","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":556,"countryCode":"CN","unitName":"KUOSHENG-1 (Taiwan, China)","typeName":"Boiling Light-Water-Cooled and Moderated Reactor","statusName":"Permanent Shutdown","countryName":"China","model":"BWR-6","alternateName":null,"typeCode":"BWR","statusCode":"4S","siteId":297,"siteName":"KUOSHENG","thermalPower":2894,"grossElectricalCapacity":985,"netElectricalCapacity":985,"designNetElectricalCapacity":948,"constructionDate":"1975-11-19T00:00:00","criticalityDate":"1981-02-01T00:00:00","gridDate":"1981-05-21T00:00:00","commercialDate":"1981-12-28T00:00:00","shutdownDate":"2021-12-28T00:00:00","constructionLicenseDate":null,"decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"1980-11-08T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Taiwan Power Co.","ownerName":"Taiwan Power Co.","turbineSupplierCode":"WH","turbineSupplierName":"WESTINGHOUSE ELECTRIC CORPORATION","reactorSupplierCode":"GE","reactorSupplierName":"GENERAL ELECTRIC CO.","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":398896,"ageNet":355944.00,"lifetimeFactor":null},{"id":557,"countryCode":"CN","unitName":"KUOSHENG-2 (Taiwan, China)","typeName":"Boiling Light-Water-Cooled and Moderated Reactor","statusName":"Permanent Shutdown","countryName":"China","model":"BWR-6","alternateName":null,"typeCode":"BWR","statusCode":"4S","siteId":297,"siteName":"KUOSHENG","thermalPower":2894,"grossElectricalCapacity":985,"netElectricalCapacity":985,"designNetElectricalCapacity":948,"constructionDate":"1976-03-15T00:00:00","criticalityDate":"1982-03-26T00:00:00","gridDate":"1982-06-29T00:00:00","commercialDate":"1983-03-16T00:00:00","shutdownDate":"2023-03-15T00:00:00","constructionLicenseDate":null,"decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"1982-04-06T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Taiwan Power Co.","ownerName":"Taiwan Power Co.","turbineSupplierCode":"WH","turbineSupplierName":"WESTINGHOUSE ELECTRIC CORPORATION","reactorSupplierCode":"GE","reactorSupplierName":"GENERAL ELECTRIC CO.","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":389200,"ageNet":356856.00,"lifetimeFactor":null},{"id":1123,"countryCode":"CN","unitName":"LIANJIANG-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"CAP1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":535,"siteName":"LIANJIANG","thermalPower":3400,"grossElectricalCapacity":1224,"netElectricalCapacity":1224,"designNetElectricalCapacity":1224,"constructionDate":"2023-09-27T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2022-09-16T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Zhanjiang Nuclear Power Company, Ltd.","ownerName":"China Power Investment Group","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"SNPEMC","reactorSupplierName":"Shanghai Nuclear Power Equipment Manufacturing Co. LTD","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":1124,"countryCode":"CN","unitName":"LIANJIANG-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"CAP1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":535,"siteName":"LIANJIANG","thermalPower":3400,"grossElectricalCapacity":1224,"netElectricalCapacity":1224,"designNetElectricalCapacity":1224,"constructionDate":"2024-04-26T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2022-09-16T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Zhanjiang Nuclear Power Company, Ltd.","ownerName":"China Power Investment Group","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":67,"countryCode":"CN","unitName":"LING AO-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"M310","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":46,"siteName":"LING AO","thermalPower":2905,"grossElectricalCapacity":990,"netElectricalCapacity":950,"designNetElectricalCapacity":950,"constructionDate":"1997-05-15T00:00:00","criticalityDate":"2002-02-04T00:00:00","gridDate":"2002-02-26T00:00:00","commercialDate":"2002-05-28T00:00:00","shutdownDate":null,"constructionLicenseDate":"1997-05-12T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2003-12-30T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Daya Bay Nuclear Power Operations and Management Co, Ltd.","ownerName":"LINGAO NUCLEAR POWER COMPANY LTD.","turbineSupplierCode":"GEC","turbineSupplierName":"GENERAL ELECTRIC COMPANY (UK)","reactorSupplierCode":"FRAM","reactorSupplierName":"FRAMATOME","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":216832,"ageNet":216816.00,"lifetimeFactor":null},{"id":68,"countryCode":"CN","unitName":"LING AO-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"M310","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":46,"siteName":"LING AO","thermalPower":2905,"grossElectricalCapacity":990,"netElectricalCapacity":950,"designNetElectricalCapacity":950,"constructionDate":"1997-11-28T00:00:00","criticalityDate":"2002-08-27T00:00:00","gridDate":"2002-09-14T00:00:00","commercialDate":"2003-01-08T00:00:00","shutdownDate":null,"constructionLicenseDate":"1997-05-12T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2003-12-30T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Daya Bay Nuclear Power Operations and Management Co, Ltd.","ownerName":"LINGAO NUCLEAR POWER COMPANY LTD.","turbineSupplierCode":"GEC","turbineSupplierName":"GENERAL ELECTRIC COMPANY (UK)","reactorSupplierCode":"FRAM","reactorSupplierName":"FRAMATOME","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":212032,"ageNet":212016.00,"lifetimeFactor":null},{"id":878,"countryCode":"CN","unitName":"LING AO-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":47,"siteName":"LING AO II","thermalPower":2905,"grossElectricalCapacity":1086,"netElectricalCapacity":1007,"designNetElectricalCapacity":1007,"constructionDate":"2005-12-15T00:00:00","criticalityDate":"2010-06-09T00:00:00","gridDate":"2010-07-15T00:00:00","commercialDate":"2010-09-15T00:00:00","shutdownDate":null,"constructionLicenseDate":"2005-12-09T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2012-12-07T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Daya Bay Nuclear Power Operations and Management Co, Ltd.","ownerName":"Lingdong Nuclear Power Company Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":143368,"ageNet":143352.00,"lifetimeFactor":null},{"id":875,"countryCode":"CN","unitName":"LING AO-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":47,"siteName":"LING AO II","thermalPower":2905,"grossElectricalCapacity":1086,"netElectricalCapacity":1007,"designNetElectricalCapacity":1007,"constructionDate":"2006-06-15T00:00:00","criticalityDate":"2011-02-25T00:00:00","gridDate":"2011-05-03T00:00:00","commercialDate":"2011-08-07T00:00:00","shutdownDate":null,"constructionLicenseDate":"2005-12-09T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2012-12-07T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Daya Bay Nuclear Power Operations and Management Co, Ltd.","ownerName":"Lingdong Nuclear Power Company Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":136360,"ageNet":136344.00,"lifetimeFactor":null},{"id":1111,"countryCode":"CN","unitName":"LINGLONG-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"ACP100","alternateName":"Hainan Changjiang SMR","typeCode":"PWR","statusCode":"2C","siteId":38,"siteName":"CHANG JIANG","thermalPower":385,"grossElectricalCapacity":125,"netElectricalCapacity":100,"designNetElectricalCapacity":100,"constructionDate":"2021-07-13T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2019-07-15T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Hainan Nuclear Power Company","ownerName":"Hainan Nuclear Power Company","turbineSupplierCode":"HTC","turbineSupplierName":"HARBIN TURBINE COMPANY LIMITED","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":1064,"countryCode":"CN","unitName":"LUFENG-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"CAP1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":48,"siteName":"LUFENG","thermalPower":3400,"grossElectricalCapacity":1250,"netElectricalCapacity":1250,"designNetElectricalCapacity":1250,"constructionDate":"2025-02-24T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2024-04-11T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CGN Lufeng Nuclear Power Co., Ltd","ownerName":"CGN Lufeng Nuclear Power Co., Ltd","turbineSupplierCode":"HTC","turbineSupplierName":"HARBIN TURBINE COMPANY LIMITED","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":1065,"countryCode":"CN","unitName":"LUFENG-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"CAP1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":48,"siteName":"LUFENG","thermalPower":3400,"grossElectricalCapacity":1200,"netElectricalCapacity":1250,"designNetElectricalCapacity":1250,"constructionDate":"2025-12-22T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2024-04-11T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CGN Lufeng Nuclear Power Co., Ltd","ownerName":"Guangdong Nuclear Power Joint Venture Co.,Ltd.","turbineSupplierCode":"HTC","turbineSupplierName":"HARBIN TURBINE COMPANY LIMITED","reactorSupplierCode":"DGHMC","reactorSupplierName":"DONGFANG (GUANGZHOU) HEAVY MACHINERY CO., LTD.","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":1113,"countryCode":"CN","unitName":"LUFENG-5","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":48,"siteName":"LUFENG","thermalPower":3180,"grossElectricalCapacity":1200,"netElectricalCapacity":1116,"designNetElectricalCapacity":1116,"constructionDate":"2022-09-08T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2022-04-26T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CGN Lufeng Nuclear Power Co., Ltd","ownerName":"CGN Lufeng Nuclear Power Co., Ltd","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":1114,"countryCode":"CN","unitName":"LUFENG-6","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":48,"siteName":"LUFENG","thermalPower":3180,"grossElectricalCapacity":1200,"netElectricalCapacity":1116,"designNetElectricalCapacity":1116,"constructionDate":"2023-08-26T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2022-04-26T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CGN Lufeng Nuclear Power Co., Ltd","ownerName":"CGN Lufeng Nuclear Power Co., Ltd","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"SENPE","reactorSupplierName":"Shanghai Electric Nuclear Power Equipment Co., Ltd","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":558,"countryCode":"CN","unitName":"MAANSHAN-1 (Taiwan, China)","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Permanent Shutdown","countryName":"China","model":"WH 3LP (WE 312)","alternateName":null,"typeCode":"PWR","statusCode":"4S","siteId":299,"siteName":"MAANSHAN","thermalPower":2822,"grossElectricalCapacity":951,"netElectricalCapacity":936,"designNetElectricalCapacity":890,"constructionDate":"1978-08-21T00:00:00","criticalityDate":"1984-03-30T00:00:00","gridDate":"1984-05-09T00:00:00","commercialDate":"1984-07-27T00:00:00","shutdownDate":"2024-07-28T00:00:00","constructionLicenseDate":"1976-07-09T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"1984-01-31T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Taiwan Power Co.","ownerName":"Taiwan Power Co.","turbineSupplierCode":"GE","turbineSupplierName":"GENERAL ELECTRIC CO.","reactorSupplierCode":"WH","reactorSupplierName":"WESTINGHOUSE ELECTRIC CORPORATION","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":372880,"ageNet":352560.00,"lifetimeFactor":null},{"id":559,"countryCode":"CN","unitName":"MAANSHAN-2 (Taiwan, China)","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Permanent Shutdown","countryName":"China","model":"WH 3LP (WE 312)","alternateName":null,"typeCode":"PWR","statusCode":"4S","siteId":299,"siteName":"MAANSHAN","thermalPower":2822,"grossElectricalCapacity":951,"netElectricalCapacity":938,"designNetElectricalCapacity":890,"constructionDate":"1979-02-21T00:00:00","criticalityDate":"1985-02-01T00:00:00","gridDate":"1985-02-25T00:00:00","commercialDate":"1985-05-18T00:00:00","shutdownDate":"2025-05-18T00:00:00","constructionLicenseDate":"1976-07-09T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"1984-10-04T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Taiwan Power Co.","ownerName":"Taiwan Power Co.","turbineSupplierCode":"GE","turbineSupplierName":"GENERAL ELECTRIC CO.","reactorSupplierCode":"WH","reactorSupplierName":"WESTINGHOUSE ELECTRIC CORPORATION","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":365872,"ageNet":352608.00,"lifetimeFactor":null},{"id":921,"countryCode":"CN","unitName":"NINGDE-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":49,"siteName":"NINGDE","thermalPower":2905,"grossElectricalCapacity":1089,"netElectricalCapacity":1018,"designNetElectricalCapacity":1018,"constructionDate":"2008-02-18T00:00:00","criticalityDate":"2012-11-24T00:00:00","gridDate":"2012-12-28T00:00:00","commercialDate":"2013-04-15T00:00:00","shutdownDate":null,"constructionLicenseDate":"2008-02-17T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2015-08-10T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Fujian Ningde Nuclear Power Company, Ltd.","ownerName":"Fujian Ningde Nuclear Power Company, Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":121840,"ageNet":121824.00,"lifetimeFactor":null},{"id":922,"countryCode":"CN","unitName":"NINGDE-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":49,"siteName":"NINGDE","thermalPower":2905,"grossElectricalCapacity":1089,"netElectricalCapacity":1018,"designNetElectricalCapacity":1018,"constructionDate":"2008-11-12T00:00:00","criticalityDate":"2013-12-20T00:00:00","gridDate":"2014-01-04T00:00:00","commercialDate":"2014-05-04T00:00:00","shutdownDate":null,"constructionLicenseDate":"2008-02-17T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2015-08-10T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Fujian Ningde Nuclear Power Company, Ltd.","ownerName":"Fujian Ningde Nuclear Power Company, Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"SHE","reactorSupplierName":"Shanghai Electric","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":112912,"ageNet":112896.00,"lifetimeFactor":null},{"id":923,"countryCode":"CN","unitName":"NINGDE-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":49,"siteName":"NINGDE","thermalPower":2905,"grossElectricalCapacity":1089,"netElectricalCapacity":1018,"designNetElectricalCapacity":1018,"constructionDate":"2010-01-08T00:00:00","criticalityDate":"2015-03-08T00:00:00","gridDate":"2015-03-21T00:00:00","commercialDate":"2015-06-10T00:00:00","shutdownDate":null,"constructionLicenseDate":"2010-01-07T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-03-06T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Fujian Ningde Nuclear Power Company, Ltd.","ownerName":"Fujian Ningde Nuclear Power Company, Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":102328,"ageNet":102312.00,"lifetimeFactor":null},{"id":924,"countryCode":"CN","unitName":"NINGDE-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":49,"siteName":"NINGDE","thermalPower":2905,"grossElectricalCapacity":1089,"netElectricalCapacity":1018,"designNetElectricalCapacity":1018,"constructionDate":"2010-09-29T00:00:00","criticalityDate":"2016-03-16T00:00:00","gridDate":"2016-03-29T00:00:00","commercialDate":"2016-07-21T00:00:00","shutdownDate":null,"constructionLicenseDate":"2010-01-07T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-03-06T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Fujian Ningde Nuclear Power Company, Ltd.","ownerName":"Fujian Ningde Nuclear Power Company, Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":93352,"ageNet":93336.00,"lifetimeFactor":null},{"id":2136,"countryCode":"CN","unitName":"NINGDE-5","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":49,"siteName":"NINGDE","thermalPower":3180,"grossElectricalCapacity":1200,"netElectricalCapacity":1200,"designNetElectricalCapacity":1200,"constructionDate":"2024-07-28T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2024-07-23T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Fujian Ningde Nuclear Power Company, Ltd.","ownerName":"Fujian Ningde Second Nuclear Power Co., Ltd.","turbineSupplierCode":"DFTC","turbineSupplierName":"Dongfang Turbine Co., Ltd","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":2137,"countryCode":"CN","unitName":"NINGDE-6","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":49,"siteName":"NINGDE","thermalPower":3190,"grossElectricalCapacity":1221,"netElectricalCapacity":1117,"designNetElectricalCapacity":1117,"constructionDate":"2025-12-16T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2024-07-23T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Fujian Ningde Nuclear Power Company, Ltd.","ownerName":"Fujian Ningde Second Nuclear Power Co., Ltd.","turbineSupplierCode":"DFTC","turbineSupplierName":"Dongfang Turbine Co., Ltd","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":65,"countryCode":"CN","unitName":"QINSHAN 2-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CNP-600","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":51,"siteName":"QINSHAN","thermalPower":1930,"grossElectricalCapacity":670,"netElectricalCapacity":623,"designNetElectricalCapacity":610,"constructionDate":"1996-06-02T00:00:00","criticalityDate":"2001-11-15T00:00:00","gridDate":"2002-02-06T00:00:00","commercialDate":"2002-04-15T00:00:00","shutdownDate":null,"constructionLicenseDate":null,"decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2017-07-11T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Nuclear Operation Management Company Limited","ownerName":"NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD.","turbineSupplierCode":"HTC","turbineSupplierName":"HARBIN TURBINE COMPANY LIMITED","reactorSupplierCode":"CNNC","reactorSupplierName":"CHINA NATIONAL NUCLEAR CORPORATION","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":217312,"ageNet":217296.00,"lifetimeFactor":null},{"id":66,"countryCode":"CN","unitName":"QINSHAN 2-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CNP-600","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":51,"siteName":"QINSHAN","thermalPower":1930,"grossElectricalCapacity":708,"netElectricalCapacity":623,"designNetElectricalCapacity":610,"constructionDate":"1997-04-01T00:00:00","criticalityDate":"2004-02-25T00:00:00","gridDate":"2004-03-11T00:00:00","commercialDate":"2004-05-03T00:00:00","shutdownDate":null,"constructionLicenseDate":null,"decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2017-07-11T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Nuclear Operation Management Company Limited","ownerName":"NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD.","turbineSupplierCode":"HTC","turbineSupplierName":"HARBIN TURBINE COMPANY LIMITED","reactorSupplierCode":"CNNC","reactorSupplierName":"CHINA NATIONAL NUCLEAR CORPORATION","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":198976,"ageNet":198960.00,"lifetimeFactor":null},{"id":876,"countryCode":"CN","unitName":"QINSHAN 2-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CNP-600","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":51,"siteName":"QINSHAN","thermalPower":1930,"grossElectricalCapacity":670,"netElectricalCapacity":623,"designNetElectricalCapacity":610,"constructionDate":"2006-04-28T00:00:00","criticalityDate":"2010-07-13T00:00:00","gridDate":"2010-08-01T00:00:00","commercialDate":"2010-10-05T00:00:00","shutdownDate":null,"constructionLicenseDate":"2006-01-24T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2013-07-01T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Nuclear Operation Management Company Limited","ownerName":"NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD.","turbineSupplierCode":"HTC","turbineSupplierName":"HARBIN TURBINE COMPANY LIMITED","reactorSupplierCode":"CNNC","reactorSupplierName":"CHINA NATIONAL NUCLEAR CORPORATION","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":142960,"ageNet":142944.00,"lifetimeFactor":null},{"id":877,"countryCode":"CN","unitName":"QINSHAN 2-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CNP-600","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":51,"siteName":"QINSHAN","thermalPower":1930,"grossElectricalCapacity":670,"netElectricalCapacity":623,"designNetElectricalCapacity":610,"constructionDate":"2007-01-28T00:00:00","criticalityDate":"2011-11-17T00:00:00","gridDate":"2011-11-25T00:00:00","commercialDate":"2011-12-30T00:00:00","shutdownDate":null,"constructionLicenseDate":null,"decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2013-07-01T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Nuclear Operation Management Company Limited","ownerName":"NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD.","turbineSupplierCode":"HTC","turbineSupplierName":"HARBIN TURBINE COMPANY LIMITED","reactorSupplierCode":"CNNC","reactorSupplierName":"CHINA NATIONAL NUCLEAR CORPORATION","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":131416,"ageNet":131400.00,"lifetimeFactor":null},{"id":69,"countryCode":"CN","unitName":"QINSHAN 3-1","typeName":"Pressurized Heavy-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CANDU 6","alternateName":null,"typeCode":"PHWR","statusCode":"1O","siteId":51,"siteName":"QINSHAN","thermalPower":2064,"grossElectricalCapacity":728,"netElectricalCapacity":677,"designNetElectricalCapacity":677,"constructionDate":"1998-06-08T00:00:00","criticalityDate":"2002-09-21T00:00:00","gridDate":"2002-11-19T00:00:00","commercialDate":"2002-12-31T00:00:00","shutdownDate":null,"constructionLicenseDate":null,"decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2006-01-09T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Nuclear Operation Management Company Limited","ownerName":"Qinshan Third nuclear power Co., LTD","turbineSupplierCode":"Hit","turbineSupplierName":"Japan Hitachi Company.","reactorSupplierCode":"AECL","reactorSupplierName":"ATOMIC ENERGY OF CANADA, LTD.","defaultImageId":553,"defaultImageName":"553.jpg","informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":210448,"ageNet":210432.00,"lifetimeFactor":null},{"id":840,"countryCode":"CN","unitName":"QINSHAN 3-2","typeName":"Pressurized Heavy-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CANDU 6","alternateName":null,"typeCode":"PHWR","statusCode":"1O","siteId":51,"siteName":"QINSHAN","thermalPower":2064,"grossElectricalCapacity":728,"netElectricalCapacity":677,"designNetElectricalCapacity":677,"constructionDate":"1998-09-25T00:00:00","criticalityDate":"2003-01-18T00:00:00","gridDate":"2003-06-12T00:00:00","commercialDate":"2003-07-24T00:00:00","shutdownDate":null,"constructionLicenseDate":null,"decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2006-01-09T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Nuclear Operation Management Company Limited","ownerName":"Qinshan Third nuclear power Co., LTD","turbineSupplierCode":"Hit","turbineSupplierName":"Japan Hitachi Company.","reactorSupplierCode":"AECL","reactorSupplierName":"ATOMIC ENERGY OF CANADA, LTD.","defaultImageId":553,"defaultImageName":"553.jpg","informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":205528,"ageNet":205512.00,"lifetimeFactor":null},{"id":62,"countryCode":"CN","unitName":"QINSHAN-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CNP-300","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":51,"siteName":"QINSHAN","thermalPower":966,"grossElectricalCapacity":330,"netElectricalCapacity":326,"designNetElectricalCapacity":289,"constructionDate":"1985-03-20T00:00:00","criticalityDate":"1991-10-31T00:00:00","gridDate":"1991-12-15T00:00:00","commercialDate":"1994-04-01T00:00:00","shutdownDate":null,"constructionLicenseDate":null,"decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2016-12-14T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC Nuclear Operation Management Company Limited","ownerName":"QINSHAN NUCLEAR POWER COMPANY","turbineSupplierCode":"STC","turbineSupplierName":"Shanghai Turbine Co.","reactorSupplierCode":"CNNC","reactorSupplierName":"CHINA NATIONAL NUCLEAR CORPORATION","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":306256,"ageNet":306240.00,"lifetimeFactor":null},{"id":1094,"countryCode":"CN","unitName":"SANAO-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":501,"siteName":"CANGNAN SANAO","thermalPower":3180,"grossElectricalCapacity":1215,"netElectricalCapacity":1117,"designNetElectricalCapacity":1208,"constructionDate":"2020-12-31T00:00:00","criticalityDate":"2026-02-14T00:00:00","gridDate":"2026-03-12T00:00:00","commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2020-12-30T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CGN Cangnan Nuclear Power Co., Ltd.","ownerName":"CGN Cangnan Nuclear Power Co., Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":6112,"ageNet":6096.00,"lifetimeFactor":null},{"id":1107,"countryCode":"CN","unitName":"SANAO-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":501,"siteName":"CANGNAN SANAO","thermalPower":3180,"grossElectricalCapacity":1210,"netElectricalCapacity":1117,"designNetElectricalCapacity":1117,"constructionDate":"2021-12-30T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2020-12-30T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CGN Cangnan Nuclear Power Co., Ltd.","ownerName":"CGN Cangnan Nuclear Power Co., Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":2168,"countryCode":"CN","unitName":"SANAO-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":445,"siteName":"  San'ao ","thermalPower":3180,"grossElectricalCapacity":1215,"netElectricalCapacity":1208,"designNetElectricalCapacity":1208,"constructionDate":"2025-11-19T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2024-09-06T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CGN Cangnan Second Nuclear Power Company, Ltd.","ownerName":"CGN Cangnan Second Nuclear Power Company, Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":879,"countryCode":"CN","unitName":"SANMEN-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"AP-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":52,"siteName":"SANMEN","thermalPower":3400,"grossElectricalCapacity":1251,"netElectricalCapacity":1157,"designNetElectricalCapacity":1157,"constructionDate":"2009-04-19T00:00:00","criticalityDate":"2018-06-21T00:00:00","gridDate":"2018-06-30T00:00:00","commercialDate":"2018-09-21T00:00:00","shutdownDate":null,"constructionLicenseDate":"2009-03-26T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-11-14T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"SANMEN NUCLEAR POWER CO., LTD.","ownerName":"SANMEN NUCLEAR POWER CO., LTD.","turbineSupplierCode":"MHI","turbineSupplierName":"MITSUBISHI HEAVY INDUSTRIES, LTD.","reactorSupplierCode":"WH/MHI","reactorSupplierName":"WESTINGHOUSE ELECTRIC CORPORATION / MITSUBISHI HEAVY INDUSTRIES, LTD.","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":73600,"ageNet":73584.00,"lifetimeFactor":null},{"id":880,"countryCode":"CN","unitName":"SANMEN-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"AP-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":52,"siteName":"SANMEN","thermalPower":3400,"grossElectricalCapacity":1251,"netElectricalCapacity":1157,"designNetElectricalCapacity":1157,"constructionDate":"2009-12-15T00:00:00","criticalityDate":"2018-08-17T00:00:00","gridDate":"2018-08-24T00:00:00","commercialDate":"2018-11-05T00:00:00","shutdownDate":null,"constructionLicenseDate":"2009-03-26T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-12-05T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"SANMEN NUCLEAR POWER CO., LTD.","ownerName":"SANMEN NUCLEAR POWER CO., LTD.","turbineSupplierCode":"MHI","turbineSupplierName":"MITSUBISHI HEAVY INDUSTRIES, LTD.","reactorSupplierCode":"WH/MHI","reactorSupplierName":"WESTINGHOUSE ELECTRIC CORPORATION / MITSUBISHI HEAVY INDUSTRIES, LTD.","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":72280,"ageNet":72264.00,"lifetimeFactor":null},{"id":995,"countryCode":"CN","unitName":"SANMEN-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"CAP1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":52,"siteName":"SANMEN","thermalPower":3400,"grossElectricalCapacity":1251,"netElectricalCapacity":1163,"designNetElectricalCapacity":1163,"constructionDate":"2022-06-28T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2013-05-03T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"SANMEN NUCLEAR POWER CO., LTD.","ownerName":"CHINA NATIONAL NUCLEAR CORPORATION","turbineSupplierCode":"HEC","turbineSupplierName":"HARBIN ELECTRIC CORPORATION","reactorSupplierCode":"Shanghai","reactorSupplierName":"Shanghai Nuclear Engineering Research & Design Institute Co. , Ltd.","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":996,"countryCode":"CN","unitName":"SANMEN-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"CAP1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":52,"siteName":"SANMEN","thermalPower":3400,"grossElectricalCapacity":1251,"netElectricalCapacity":1163,"designNetElectricalCapacity":1163,"constructionDate":"2023-03-22T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2013-05-03T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"SANMEN NUCLEAR POWER CO., LTD.","ownerName":"CHINA NATIONAL NUCLEAR CORPORATION","turbineSupplierCode":"HEC","turbineSupplierName":"HARBIN ELECTRIC CORPORATION","reactorSupplierCode":"Shanghai","reactorSupplierName":"Shanghai Nuclear Engineering Research & Design Institute Co. , Ltd.","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":957,"countryCode":"CN","unitName":"SHIDAO BAY-1","typeName":"High-Temperature Gas-Cooled Reactor","statusName":"Operational","countryName":"China","model":"HTR-PM","alternateName":"","typeCode":"HTGR","statusCode":"1O","siteId":54,"siteName":"SHIDAOWAN","thermalPower":500,"grossElectricalCapacity":211,"netElectricalCapacity":150,"designNetElectricalCapacity":200,"constructionDate":"2012-12-09T00:00:00","criticalityDate":"2021-09-12T00:00:00","gridDate":"2021-12-14T00:00:00","commercialDate":"2023-12-06T00:00:00","shutdownDate":null,"constructionLicenseDate":"2012-12-04T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2021-03-15T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd.","ownerName":"China Huaneng Group","turbineSupplierCode":"STC","turbineSupplierName":"Shanghai Turbine Co.","reactorSupplierCode":"TSINGHUA","reactorSupplierName":"Tsinghua university","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":43288,"ageNet":43272.00,"lifetimeFactor":null},{"id":2138,"countryCode":"CN","unitName":"SHIDAOWAN-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":54,"siteName":"SHIDAOWAN","thermalPower":3180,"grossElectricalCapacity":1225,"netElectricalCapacity":1134,"designNetElectricalCapacity":1134,"constructionDate":"2024-07-28T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2023-01-12T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd.","ownerName":"Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":2139,"countryCode":"CN","unitName":"SHIDAOWAN-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":54,"siteName":"SHIDAOWAN","thermalPower":3180,"grossElectricalCapacity":1225,"netElectricalCapacity":1134,"designNetElectricalCapacity":1134,"constructionDate":"2025-05-07T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2023-01-12T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd.","ownerName":"Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd.","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":1084,"countryCode":"CN","unitName":"TAIPINGLING-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":55,"siteName":"TAIPINGLING","thermalPower":3190,"grossElectricalCapacity":1202,"netElectricalCapacity":1116,"designNetElectricalCapacity":1116,"constructionDate":"2019-12-26T00:00:00","criticalityDate":"2026-02-03T00:00:00","gridDate":"2026-02-13T00:00:00","commercialDate":"2026-04-19T00:00:00","shutdownDate":null,"constructionLicenseDate":"2019-02-01T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CGN Huizhou Nuclear Power Co.,Ltd,","ownerName":"CGN Huizhou Nuclear Power Co.,Ltd,","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":6760,"ageNet":6744.00,"lifetimeFactor":null},{"id":1091,"countryCode":"CN","unitName":"TAIPINGLING-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":55,"siteName":"TAIPINGLING","thermalPower":3190,"grossElectricalCapacity":1202,"netElectricalCapacity":1116,"designNetElectricalCapacity":1116,"constructionDate":"2020-10-15T00:00:00","criticalityDate":"2026-06-25T00:00:00","gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2019-02-01T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CGN Huizhou Nuclear Power Co.,Ltd,","ownerName":"CGN Huizhou Nuclear Power Co.,Ltd,","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":2142,"countryCode":"CN","unitName":"TAIPINGLING-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":55,"siteName":"TAIPINGLING","thermalPower":3180,"grossElectricalCapacity":1209,"netElectricalCapacity":1209,"designNetElectricalCapacity":1209,"constructionDate":"2025-06-10T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2024-01-05T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CGN Huizhou Second Nuclear Power Co., Ltd","ownerName":"CGN Huizhou Second Nuclear Power Co., Ltd","turbineSupplierCode":"HTC","turbineSupplierName":"HARBIN TURBINE COMPANY LIMITED","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":2143,"countryCode":"CN","unitName":"TAIPINGLING-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":55,"siteName":"TAIPINGLING","thermalPower":3180,"grossElectricalCapacity":1209,"netElectricalCapacity":1209,"designNetElectricalCapacity":1209,"constructionDate":"2026-05-10T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2024-01-05T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CGN Huizhou Second Nuclear Power Co., Ltd","ownerName":"CGN Huizhou Second Nuclear Power Co., Ltd","turbineSupplierCode":"HTC","turbineSupplierName":"HARBIN TURBINE COMPANY LIMITED","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":918,"countryCode":"CN","unitName":"TAISHAN-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"EPR-1750","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":56,"siteName":"TAISHAN","thermalPower":4590,"grossElectricalCapacity":1750,"netElectricalCapacity":1660,"designNetElectricalCapacity":1660,"constructionDate":"2009-11-18T00:00:00","criticalityDate":"2018-06-06T00:00:00","gridDate":"2018-06-29T00:00:00","commercialDate":"2018-12-13T00:00:00","shutdownDate":null,"constructionLicenseDate":"2009-08-21T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2019-01-12T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Taishan Nuclear Power Joint Venture Company Limited","ownerName":"Taishan Nuclear Power Joint Venture Company Limited","turbineSupplierCode":"ALSTOM","turbineSupplierName":"ALSTOM","reactorSupplierCode":"FRAM","reactorSupplierName":"FRAMATOME","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":73624,"ageNet":73608.00,"lifetimeFactor":null},{"id":919,"countryCode":"CN","unitName":"TAISHAN-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"EPR-1750","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":56,"siteName":"TAISHAN","thermalPower":4590,"grossElectricalCapacity":1750,"netElectricalCapacity":1660,"designNetElectricalCapacity":1660,"constructionDate":"2010-04-15T00:00:00","criticalityDate":"2019-05-28T00:00:00","gridDate":"2019-06-23T00:00:00","commercialDate":"2019-09-07T00:00:00","shutdownDate":null,"constructionLicenseDate":"2009-11-18T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2019-01-12T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Taishan Nuclear Power Joint Venture Company Limited","ownerName":"Taishan Nuclear Power Joint Venture Company Limited","turbineSupplierCode":"ALSTOM","turbineSupplierName":"ALSTOM","reactorSupplierCode":"FRAM","reactorSupplierName":"FRAMATOME","defaultImageId":664,"defaultImageName":"664.jpg","informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":65008,"ageNet":64992.00,"lifetimeFactor":null},{"id":838,"countryCode":"CN","unitName":"TIANWAN-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"VVER V-428","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":58,"siteName":"TIANWAN","thermalPower":3000,"grossElectricalCapacity":1060,"netElectricalCapacity":1000,"designNetElectricalCapacity":990,"constructionDate":"1999-10-20T00:00:00","criticalityDate":"2005-12-20T00:00:00","gridDate":"2006-05-12T00:00:00","commercialDate":"2007-05-17T00:00:00","shutdownDate":null,"constructionLicenseDate":"1999-10-18T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2008-10-17T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Jiangsu Nuclear Power Corporation","ownerName":"Jiangsu Nuclear Power Corporation","turbineSupplierCode":"LMZ","turbineSupplierName":"JOINT-STOCK COMPANY \"LENINGRADSKIY METALLICHESKIY ZAVOD\"","reactorSupplierCode":"IZ","reactorSupplierName":"Izhorskiye Zavody","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":179968,"ageNet":179952.00,"lifetimeFactor":null},{"id":839,"countryCode":"CN","unitName":"TIANWAN-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"VVER V-428","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":58,"siteName":"TIANWAN","thermalPower":3000,"grossElectricalCapacity":1060,"netElectricalCapacity":1000,"designNetElectricalCapacity":990,"constructionDate":"2000-09-20T00:00:00","criticalityDate":"2007-05-01T00:00:00","gridDate":"2007-05-14T00:00:00","commercialDate":"2007-08-16T00:00:00","shutdownDate":null,"constructionLicenseDate":"1999-10-18T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2008-10-17T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Jiangsu Nuclear Power Corporation","ownerName":"Jiangsu Nuclear Power Corporation","turbineSupplierCode":"LMZ","turbineSupplierName":"JOINT-STOCK COMPANY \"LENINGRADSKIY METALLICHESKIY ZAVOD\"","reactorSupplierCode":"IZ","reactorSupplierName":"Izhorskiye Zavody","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":171160,"ageNet":171144.00,"lifetimeFactor":null},{"id":973,"countryCode":"CN","unitName":"TIANWAN-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"VVER V-428M","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":58,"siteName":"TIANWAN","thermalPower":3000,"grossElectricalCapacity":1126,"netElectricalCapacity":1060,"designNetElectricalCapacity":1060,"constructionDate":"2012-12-27T00:00:00","criticalityDate":"2017-09-29T00:00:00","gridDate":"2017-12-30T00:00:00","commercialDate":"2018-02-14T00:00:00","shutdownDate":null,"constructionLicenseDate":"2012-12-26T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-01-30T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Jiangsu Nuclear Power Corporation","ownerName":"Jiangsu Nuclear Power Corporation","turbineSupplierCode":"HTC","turbineSupplierName":"HARBIN TURBINE COMPANY LIMITED","reactorSupplierCode":"IZ","reactorSupplierName":"Izhorskiye Zavody","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":77968,"ageNet":77952.00,"lifetimeFactor":null},{"id":974,"countryCode":"CN","unitName":"TIANWAN-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"VVER V-428M","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":58,"siteName":"TIANWAN","thermalPower":3000,"grossElectricalCapacity":1126,"netElectricalCapacity":1060,"designNetElectricalCapacity":1060,"constructionDate":"2013-09-27T00:00:00","criticalityDate":"2018-09-30T00:00:00","gridDate":"2018-10-27T00:00:00","commercialDate":"2018-12-22T00:00:00","shutdownDate":null,"constructionLicenseDate":"2012-12-26T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-01-11T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Jiangsu Nuclear Power Corporation","ownerName":"Jiangsu Nuclear Power Corporation","turbineSupplierCode":"HTC","turbineSupplierName":"HARBIN TURBINE COMPANY LIMITED","reactorSupplierCode":"IZ","reactorSupplierName":"Izhorskiye Zavody","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":70744,"ageNet":70728.00,"lifetimeFactor":null},{"id":975,"countryCode":"CN","unitName":"TIANWAN-5","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CNP-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":58,"siteName":"TIANWAN","thermalPower":2905,"grossElectricalCapacity":1118,"netElectricalCapacity":1060,"designNetElectricalCapacity":1000,"constructionDate":"2015-12-27T00:00:00","criticalityDate":"2020-07-27T00:00:00","gridDate":"2020-08-08T00:00:00","commercialDate":"2020-09-08T00:00:00","shutdownDate":null,"constructionLicenseDate":"2015-12-23T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2019-01-24T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Jiangsu Nuclear Power Corporation","ownerName":"Jiangsu Nuclear Power Corporation","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"SHE","reactorSupplierName":"Shanghai Electric","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":55120,"ageNet":55104.00,"lifetimeFactor":null},{"id":976,"countryCode":"CN","unitName":"TIANWAN-6","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CNP-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":58,"siteName":"TIANWAN","thermalPower":2905,"grossElectricalCapacity":1118,"netElectricalCapacity":1060,"designNetElectricalCapacity":1000,"constructionDate":"2016-09-07T00:00:00","criticalityDate":"2021-05-04T00:00:00","gridDate":"2021-05-11T00:00:00","commercialDate":"2021-06-02T00:00:00","shutdownDate":null,"constructionLicenseDate":"2015-12-23T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2020-09-09T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Jiangsu Nuclear Power Corporation","ownerName":"Jiangsu Nuclear Power Corporation","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":48496,"ageNet":48480.00,"lifetimeFactor":null},{"id":1105,"countryCode":"CN","unitName":"TIANWAN-7","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"VVER-1200/V491","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":58,"siteName":"TIANWAN","thermalPower":3200,"grossElectricalCapacity":1265,"netElectricalCapacity":1171,"designNetElectricalCapacity":1171,"constructionDate":"2021-05-19T00:00:00","criticalityDate":"2026-10-08T00:00:00","gridDate":"2026-10-08T00:00:00","commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2021-04-29T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Jiangsu Nuclear Power Corporation","ownerName":"CHINA NATIONAL NUCLEAR CORPORATION","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"Atommash AEM-Technologies","reactorSupplierName":"Atommash AEM-Technologies","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":1072,"ageNet":1056.00,"lifetimeFactor":null},{"id":1110,"countryCode":"CN","unitName":"TIANWAN-8","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"VVER-1200/V491","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":58,"siteName":"TIANWAN","thermalPower":3200,"grossElectricalCapacity":1265,"netElectricalCapacity":1171,"designNetElectricalCapacity":1171,"constructionDate":"2022-02-25T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2021-04-29T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Jiangsu Nuclear Power Corporation","ownerName":"CHINA NATIONAL NUCLEAR CORPORATION","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"Atommash AEM-Technologies","reactorSupplierName":"Atommash AEM-Technologies","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":1101,"countryCode":"CN","unitName":"XIAPU-1","typeName":"Fast Breeder Reactor","statusName":"Under Construction","countryName":"China","model":"CFR600","alternateName":null,"typeCode":"FBR","statusCode":"2C","siteId":442,"siteName":"Changtable island","thermalPower":1882,"grossElectricalCapacity":682,"netElectricalCapacity":642,"designNetElectricalCapacity":642,"constructionDate":"2017-12-29T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2017-12-28T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CHINA NATIONAL NUCLEAR CORPORATION","ownerName":"CNNC Longyuan Technology Co. , Ltd","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"CIAE(China)","reactorSupplierName":"China Institute of Atomic Energy","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":2121,"countryCode":"CN","unitName":"XIAPU-2","typeName":"Fast Breeder Reactor","statusName":"Under Construction","countryName":"China","model":"CFR600","alternateName":null,"typeCode":"FBR","statusCode":"2C","siteId":442,"siteName":"Changtable island","thermalPower":1882,"grossElectricalCapacity":682,"netElectricalCapacity":642,"designNetElectricalCapacity":642,"constructionDate":"2020-12-27T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2017-12-28T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CHINA NATIONAL NUCLEAR CORPORATION","ownerName":"CNNC Longyuan Technology Co. , Ltd","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"CIAE(China)","reactorSupplierName":"China Institute of Atomic Energy","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":999,"countryCode":"CN","unitName":"XUDAPU-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"CAP1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":61,"siteName":"XUDABU","thermalPower":2905,"grossElectricalCapacity":1290,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2023-11-03T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":null,"decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"LIAONING NUCLEAR POWER COMPANY, LMT.","ownerName":"CHINA NATIONAL NUCLEAR CORPORATION","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":1000,"countryCode":"CN","unitName":"XUDAPU-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"CAP1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":61,"siteName":"XUDABU","thermalPower":2905,"grossElectricalCapacity":1290,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2024-07-17T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2013-05-27T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"LIAONING NUCLEAR POWER COMPANY, LMT.","ownerName":"CHINA NATIONAL NUCLEAR CORPORATION","turbineSupplierCode":"DEC","turbineSupplierName":"Dongfang Electric Corporation\r\n","reactorSupplierCode":"DEC","reactorSupplierName":"Dongfang Electric Corporation\r\n","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":1104,"countryCode":"CN","unitName":"XUDAPU-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"VVER-1200/V491","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":61,"siteName":"XUDABU","thermalPower":3200,"grossElectricalCapacity":1274,"netElectricalCapacity":1200,"designNetElectricalCapacity":1200,"constructionDate":"2021-07-28T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2020-08-19T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"LIAONING NUCLEAR POWER COMPANY, LMT.","ownerName":"CHINA NATIONAL NUCLEAR CORPORATION","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"Russian Hydraulic Press Design","reactorSupplierName":"Russian Hydraulic Press Design Institute (OKB)","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":1112,"countryCode":"CN","unitName":"XUDAPU-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"VVER-1200/V491","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":61,"siteName":"XUDABU","thermalPower":3200,"grossElectricalCapacity":1274,"netElectricalCapacity":1200,"designNetElectricalCapacity":1200,"constructionDate":"2022-05-19T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2020-08-19T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"LIAONING NUCLEAR POWER COMPANY, LMT.","ownerName":"CHINA NATIONAL NUCLEAR CORPORATION","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"Atommash AEM-Technologies","reactorSupplierName":"Atommash AEM-Technologies","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":2170,"countryCode":"CN","unitName":"XUWEI-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":1586,"siteName":"XUWEI","thermalPower":3190,"grossElectricalCapacity":1208,"netElectricalCapacity":729,"designNetElectricalCapacity":729,"constructionDate":"2026-01-16T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2024-08-30T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNC SuNeng Nuclear Power Co., Ltd.","ownerName":"CNNC SuNeng Nuclear Power Co., Ltd.","turbineSupplierCode":"HE","turbineSupplierName":"Harbin Electric Co., Ltd.","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":881,"countryCode":"CN","unitName":"YANGJIANG-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":62,"siteName":"YANGJIANG","thermalPower":2905,"grossElectricalCapacity":1086,"netElectricalCapacity":1000,"designNetElectricalCapacity":1021,"constructionDate":"2008-12-16T00:00:00","criticalityDate":"2013-12-23T00:00:00","gridDate":"2013-12-31T00:00:00","commercialDate":"2014-03-25T00:00:00","shutdownDate":null,"constructionLicenseDate":"2008-12-12T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2016-11-24T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Yangjiang Nuclear Power Company","ownerName":"Yangjiang Nuclear Power Company","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":3055,"defaultImageName":"3055.jpg","informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":113008,"ageNet":112992.00,"lifetimeFactor":null},{"id":882,"countryCode":"CN","unitName":"YANGJIANG-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":62,"siteName":"YANGJIANG","thermalPower":2905,"grossElectricalCapacity":1086,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2009-06-04T00:00:00","criticalityDate":"2015-03-02T00:00:00","gridDate":"2015-03-10T00:00:00","commercialDate":"2015-06-05T00:00:00","shutdownDate":null,"constructionLicenseDate":"2008-12-12T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2016-11-24T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Yangjiang Nuclear Power Company","ownerName":"Yangjiang Nuclear Power Company","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":3055,"defaultImageName":"3055.jpg","informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":102592,"ageNet":102576.00,"lifetimeFactor":null},{"id":931,"countryCode":"CN","unitName":"YANGJIANG-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":62,"siteName":"YANGJIANG","thermalPower":2905,"grossElectricalCapacity":1086,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2010-11-15T00:00:00","criticalityDate":"2015-10-11T00:00:00","gridDate":"2015-10-18T00:00:00","commercialDate":"2016-01-01T00:00:00","shutdownDate":null,"constructionLicenseDate":"2010-11-12T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-06-15T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Yangjiang Nuclear Power Company","ownerName":"Yangjiang Nuclear Power Company","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":3055,"defaultImageName":"3055.jpg","informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":97264,"ageNet":97248.00,"lifetimeFactor":null},{"id":932,"countryCode":"CN","unitName":"YANGJIANG-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"CPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":62,"siteName":"YANGJIANG","thermalPower":2905,"grossElectricalCapacity":1086,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2012-11-17T00:00:00","criticalityDate":"2016-12-30T00:00:00","gridDate":"2017-01-08T00:00:00","commercialDate":"2017-03-15T00:00:00","shutdownDate":null,"constructionLicenseDate":"2010-11-12T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-06-15T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Yangjiang Nuclear Power Company","ownerName":"Yangjiang Nuclear Power Company","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":3055,"defaultImageName":"3055.jpg","informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":86512,"ageNet":86496.00,"lifetimeFactor":null},{"id":933,"countryCode":"CN","unitName":"YANGJIANG-5","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"ACPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":62,"siteName":"YANGJIANG","thermalPower":2905,"grossElectricalCapacity":1086,"netElectricalCapacity":1000,"designNetElectricalCapacity":1021,"constructionDate":"2013-09-18T00:00:00","criticalityDate":"2018-05-16T00:00:00","gridDate":"2018-05-23T00:00:00","commercialDate":"2018-07-12T00:00:00","shutdownDate":null,"constructionLicenseDate":"2013-02-28T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-06-27T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Yangjiang Nuclear Power Company","ownerName":"Yangjiang Nuclear Power Company","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":3055,"defaultImageName":"3055.jpg","informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":74512,"ageNet":74496.00,"lifetimeFactor":null},{"id":934,"countryCode":"CN","unitName":"YANGJIANG-6","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"ACPR-1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":62,"siteName":"YANGJIANG","thermalPower":2905,"grossElectricalCapacity":1086,"netElectricalCapacity":1000,"designNetElectricalCapacity":1000,"constructionDate":"2013-12-23T00:00:00","criticalityDate":"2019-06-22T00:00:00","gridDate":"2019-06-29T00:00:00","commercialDate":"2019-07-24T00:00:00","shutdownDate":null,"constructionLicenseDate":"2013-02-28T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2018-12-10T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"Yangjiang Nuclear Power Company","ownerName":"Yangjiang Nuclear Power Company","turbineSupplierCode":"SEG","turbineSupplierName":"Shanghai Electric Group","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":3055,"defaultImageName":"3055.jpg","informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":64864,"ageNet":64848.00,"lifetimeFactor":null},{"id":1083,"countryCode":"CN","unitName":"ZHANGZHOU-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":63,"siteName":"ZHANGZHOU","thermalPower":3190,"grossElectricalCapacity":1212,"netElectricalCapacity":1126,"designNetElectricalCapacity":1126,"constructionDate":"2019-10-16T00:00:00","criticalityDate":"2024-11-07T00:00:00","gridDate":"2024-11-28T00:00:00","commercialDate":"2025-01-01T00:00:00","shutdownDate":null,"constructionLicenseDate":"2019-01-31T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNP Guodian Zhangzhou Energy Co.,Ltd","ownerName":"CNNP Guodian Zhangzhou Energy Co.,Ltd","turbineSupplierCode":"SEPG","turbineSupplierName":"SHANGHAI ELECTRIC","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":17368,"ageNet":17352.00,"lifetimeFactor":null},{"id":1090,"countryCode":"CN","unitName":"ZHANGZHOU-2","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"1O","siteId":63,"siteName":"ZHANGZHOU","thermalPower":3190,"grossElectricalCapacity":1212,"netElectricalCapacity":1126,"designNetElectricalCapacity":1126,"constructionDate":"2020-09-04T00:00:00","criticalityDate":"2025-11-03T00:00:00","gridDate":"2025-11-22T00:00:00","commercialDate":"2026-01-01T00:00:00","shutdownDate":null,"constructionLicenseDate":"2019-02-02T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNP Guodian Zhangzhou Energy Co.,Ltd","ownerName":"CNNP Guodian Zhangzhou Energy Co.,Ltd","turbineSupplierCode":"SEPG","turbineSupplierName":"SHANGHAI ELECTRIC","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":8752,"ageNet":8736.00,"lifetimeFactor":null},{"id":1121,"countryCode":"CN","unitName":"ZHANGZHOU-3","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":63,"siteName":"ZHANGZHOU","thermalPower":3180,"grossElectricalCapacity":1214,"netElectricalCapacity":1129,"designNetElectricalCapacity":1129,"constructionDate":"2024-02-22T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2022-06-01T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNP Guodian Zhangzhou Energy Co.,Ltd","ownerName":"CNNP Guodian Zhangzhou Energy Co.,Ltd","turbineSupplierCode":"SEPG","turbineSupplierName":"SHANGHAI ELECTRIC","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":1122,"countryCode":"CN","unitName":"ZHANGZHOU-4","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":63,"siteName":"ZHANGZHOU","thermalPower":3180,"grossElectricalCapacity":1214,"netElectricalCapacity":1129,"designNetElectricalCapacity":1129,"constructionDate":"2024-09-27T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2022-06-01T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":"CNNP Guodian Zhangzhou Energy Co.,Ltd","ownerName":"CNNP Guodian Zhangzhou Energy Co.,Ltd","turbineSupplierCode":"SEPG","turbineSupplierName":"SHANGHAI ELECTRIC","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null},{"id":2171,"countryCode":"CN","unitName":"ZHAOYUAN-1","typeName":"Pressurized Light-Water-Moderated and Cooled Reactor","statusName":"Under Construction","countryName":"China","model":"HPR1000","alternateName":null,"typeCode":"PWR","statusCode":"2C","siteId":1591,"siteName":" ZHAOYUAN ","thermalPower":3190,"grossElectricalCapacity":1214,"netElectricalCapacity":1117,"designNetElectricalCapacity":1117,"constructionDate":"2025-11-18T00:00:00","criticalityDate":null,"gridDate":null,"commercialDate":null,"shutdownDate":null,"constructionLicenseDate":"2024-11-04T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":null,"latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Far East","operatorName":null,"ownerName":null,"turbineSupplierCode":"HE","turbineSupplierName":"Harbin Electric Co., Ltd.","reactorSupplierCode":"CFHI","reactorSupplierName":"China First Heavy Industries","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":null,"ageNet":0.00,"lifetimeFactor":null}]}