{"items":[{"id":442,"countryCode":"RO","unitName":"CERNAVODA-1","typeName":"Pressurized Heavy-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"Romania","model":"CANDU 6","alternateName":null,"typeCode":"PHWR","statusCode":"1O","siteId":241,"siteName":"CERNAVODA","thermalPower":2180,"grossElectricalCapacity":706,"netElectricalCapacity":650,"designNetElectricalCapacity":650,"constructionDate":"1983-03-31T00:00:00","criticalityDate":"1996-04-16T00:00:00","gridDate":"1996-07-11T00:00:00","commercialDate":"1996-12-02T00:00:00","shutdownDate":null,"constructionLicenseDate":"1981-07-11T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2022-09-29T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Eastern Europe","operatorName":"SOCIETATEA NATIONALA NUCLEARELECTRICA, S.A.","ownerName":"Ministerul Economiei, Comertului si mediului de Afaceri","turbineSupplierCode":"G.E.","turbineSupplierName":"General Electric","reactorSupplierCode":"AECL","reactorSupplierName":"ATOMIC ENERGY OF CANADA, LTD.","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":266285,"ageNet":266280.00,"lifetimeFactor":null},{"id":443,"countryCode":"RO","unitName":"CERNAVODA-2","typeName":"Pressurized Heavy-Water-Moderated and Cooled Reactor","statusName":"Operational","countryName":"Romania","model":"CANDU 6","alternateName":null,"typeCode":"PHWR","statusCode":"1O","siteId":241,"siteName":"CERNAVODA","thermalPower":2180,"grossElectricalCapacity":705,"netElectricalCapacity":650,"designNetElectricalCapacity":650,"constructionDate":"1983-07-01T00:00:00","criticalityDate":"2007-05-06T00:00:00","gridDate":"2007-08-07T00:00:00","commercialDate":"2007-11-01T00:00:00","shutdownDate":null,"constructionLicenseDate":"1982-07-14T00:00:00","decommissioningStartDate":null,"decommissioningEndDate":null,"latestOperatingLicenseDate":"2020-06-16T00:00:00","latestSuspendedOperationsDate":null,"latestSuspendedConstructionsDate":null,"rupUnitTypeCode":"Net","rupUnitTypeName":"Net","regionName":"Eastern Europe","operatorName":"SOCIETATEA NATIONALA NUCLEARELECTRICA, S.A.","ownerName":"Ministerul Economiei, Comertului si mediului de Afaceri","turbineSupplierCode":"G.E.","turbineSupplierName":"General Electric","reactorSupplierCode":"AECL","reactorSupplierName":"ATOMIC ENERGY OF CANADA, LTD.","defaultImageId":null,"defaultImageName":null,"informationStatusCode":"PUB","informationStatusDescription":"Published","latestRestartConstructionsDate":null,"latestRestartOperationsDate":null,"ageGross":169229,"ageNet":169224.00,"lifetimeFactor":null}]}